Full Value Chain Blueprint.
ZeroPact is establishing the Pilot LCA Architecture for SAPEC Química S.A. To achieve ISO 14067 compliance for ARRÁBIDA EcoDil D067.01 and DILUENTE CELULOSO 69, we require detailed primary data mapping.
ISO 14067 Technical Framework
This request represents the "Full Inventory Analysis" phase. By collecting origin-specific and supplier-verified data, we eliminate the "uncertainty penalty" applied to generic chemical databases.
Current Pilot Boundary
Cradle-to-Gate
The assessment starts at raw material extraction and ends when the product leaves the SAPEC facility. Downstream logistics and end-of-life are excluded from current impact calculations.
Functional Unit
1 Unit (Standardized)
Calculated per kg/L at factory gate to ensure B2B comparability.
Raw Materials & Upstream
Active Pilot Stage
| Data Field | Technical Requirement | Boundary | Priority |
|---|---|---|---|
| Supplier Identity & City | Manufacturer name and exact city/port of origin for each solvent. | Cradle | High |
| Annual Purchase Volume | Total tonnes purchased in 2025 for economic allocation modeling. | Gate | Medium |
| Production Method | Synthesis type (Fossil vs. Bio-based vs. Recycled). | Cradle | High |
Manufacturing / SAPEC Ops
Active Pilot Stage
| Data Field | Technical Requirement | Boundary | Priority |
|---|---|---|---|
| Electricity & Steam Mix | Consumption per kg of product + Guarantees of Origin (GOs). | Gate | High |
| Waste Streams | Breakdown of hazardous waste per functional unit. | Gate | Medium |
| Direct Air Emissions | VOC emissions captured during blending operations. | Gate | Medium |
Packaging Systems
Active Pilot Stage
| Data Field | Technical Requirement | Boundary | Priority |
|---|---|---|---|
| Specific Material Mass | Grams of steel, plastic, or board per finished unit. | Gate | High |
| Recycled Content % | Verified post-consumer recycled content (PCR). | Cradle | Medium |
Logistics & Distro
Excluded from Cradle-to-Gate Pilot
End-of-Life / Circularity
Excluded from Cradle-to-Gate Pilot
Boundary Summary
Data collection should focus exclusively on Stages 01, 02, and 03. Stages 04 and 05 are shown for architectural completeness but do not impact the current LCA scores for the pilot project.